Monday, 11 May 2015

First filming day!

Over the holiday's I finally managed to get the cast , props (e.g. car) and camera together to do some filming for my short film. Preparing for the filming day had many significant problems throughout the day. As usual there where cancellations from many of the film crew, which meant that I had very few people to help me with the pop up reflectors and clapper board. Additionally, my make up artist wasn't available for the date, which meant I had to leave out a cresial close up of the Zombies body. Never the less, I was able to film a very large amount within the time frame.

The day began with getting the actors to the set (my house and outside my house). As both actors where not able to get to the set I had to arrange transport for them. I picked up Rowen (the husband actor) on my motorcycle and I arranged a taxi, which I payed for, to pick up Phee (the wife actress).

Before the enitial filming I opened with an ice breaker of filming the three of us, introducing Phee, and Rowan. This video can be seen below.



The filming was rather successful in regards to the amount we managed to achieve. By 12:00 We had finished all of the indoor filming. This left us plenty of time for the Jeep to arrive for the out door filming. After starting the

No comments:

Post a Comment